Project Block
The following Project Block configuration is automatically updated when the system is synced with SAP, and automatically attached to the company code.
Note: If the system is operating in standalone mode, all mandatory tables have to be maintained manually.
Table | Description | SAP Sync | Auto-Attached | Standalone |
---|---|---|---|---|
Project |
A set of interrelated tasks and subtasks that define an initiative. The tasks and sub-tasks in a project are synonymous with network activities and work breakdown structure (WBS) elements. |
Yes |
Yes |
Optional |
Work Breakdown Structure |
Basis for the organization and coordination of a project. |
Yes |
Yes |
Optional |
To view or configure Controlling Areas:
- Click Application Menu > Master Data Configuration.
- Navigate to System Configs > System.
- Click on the row for the required system.
- Navigate to System Configs > System > Company.
- Click on the row for the required company.
- Navigate to System Configs > System > Company > Project Block > Project.
- Note that any changes to this table will be overridden the next time the system configuration is synced with SAP.
- For standalone systems:
- To add a new project, click Menu > Add. Enter the required information and click Submit.
- To detach an existing project from the company, select the required row and click Menu > Detach.
- To attach an existing project to the company, click the Available tab, select the required row, and click Menu > Attach.
To view or configure WBS:
- Click Application Menu > Master Data Configuration.
- Navigate to System Configs > System.
- Click on the row for the required system.
- Navigate to System Configs > System > Company.
- Click on the row for the required company.
- Navigate to System Configs > System > Company > Project Block > Work Breakdown Structure.
- Note that any changes to this table will be overridden the next time the system configuration is synced with SAP.
- For standalone systems:
- To add a new WBS, click Menu > Add. Enter the required information and click Submit.
- To detach an existing WBS from the company, select the required row and click Menu > Detach.
- To attach an existing WBS to the company, click the Available tab, select the required row, and click Menu > Attach.